They are intended to be used as a guide in the preparation and submittal of plans for private development and city contract projects within the city of raleigh and the citys extraterritorial jurisdiction. Rightclick dwg icon to download autocad file or pdf icon for pdf file. A floor cleanout is an emergency access to a plugged drain line. Watts drainage products co200r epoxy coated cast iron floor cleanout with 518 in mm round adjustable nickel bronze standard top and no hub mj connection. Dated january 1, 2012 sw 03a, precast concrete noise wall 1 of 2. Force main cleanout with standard details sewage air. Pdf z1441 wall cleanout with smooth access cover cad details. Find the specifications, installation guides, approvals and other ads product engineering resources you need by searching our engineering resources database.
Z9apco1 pvdf adjustable floor cleanout cad details. See detail c ori4d for post connections double joist orstringer beam framing angle i pier block cantil ver 2x depth of joist postw2x support cleat both sides pier block on undistured soil gravel orfooting cantilever 2xdepth ofbeam max. No manual flush valves unless approved by shsu fixed volume piston. Dated january 1, 2012 sw 01b, precast concrete cattle guard. Ls3a tree preservation on filled site w retaining wall. Filter by product or market type, and even by the type of information source you need.
Mifab series c1100rc adjustable floor cleanout with lacquered cast iron body and anchor flange, secondary o ring test seal, 4 diameter cleanout opening and round nickel bronze scoriated combined cover and plug top assembly with stainless steel vandal proof allen key screws, and primary gasket seal and 112 round stainless steel carpet marker. Standard construction details city of ormond beach, fl. Further to that, all kinds of auto cad blocks and house plan small house plan, single story house plan, double story house plan. Ls3b tree preservation on filled site wo retaining wall.
Top of wall elevations do not include correction for soil reinforcement thickness. S31 lateral saddle installation detail for pvc pipe. Josam josam cleanouts by commercial plumbing supply. Wall 0r floor access covers when outlet size does not apply, refer to dimension table for type no. City engineer standard detail drop inlet type 1 415 6 12 12 6 36 4 4 2 typ. They are used to train mechanics, hotels, supermarkets and other toilet installation. The next standard plans manual revision, due approximately august. Base of wall detail anchored brick veneer, cmu backing, cmu foundation 01. Cleanouts and access covers mifab floor cleanouts feature a wide flange cleanout body with an adjustable stainless steel or nickel bronze combined access cover and gasketed plug with oring test seal. Standard details select a document from the list below. Cleanout selec on 090116 wade drains 11910 cr492, tyler, tx, 75706 phone. Arcat free architectural cad drawings, blocks and details for download in dwg and pdf formats for use with autocad and other 2d and 3d design software. By downloading and using any arcat cad detail content you agree to the following license agreement.
It makes sense for the cleanout to be designed for immediate access without the need. Please use this form if you have any questions or comments about our website and well get back with you very soon. Bott of wall typ offset and longitudinal dimensions are based on front face of wall at elevation 6070. Notes on walks and wheelchair ramps for designers and construction engineers pdf 8. For example, if a stack will be concealed by a finished wall, provisions must be made for access to the cleanout.
This access could take the form of an access door, or the cleanout could simply extend past the finished wall covering. These features ensure the specifier, installer and user of completely troublefree installation and performance. Stainless steel floor cleanout with heavy duty adjustable cover and plug mifab series c specify top assembly design adjustable. The adjustowall coupling will provide 12 horizontal adjustment in either direction with the coupling extended 516 past face of the. If the cleanout is serving a pipe concealed by a floor, the cleanout must be. Gdot standards may be used only when there is no conflict with coa standards. Type i low pressure cleanout detail for nontraffic areas only. Wastewater main cleanout 317 castiron wastewater mainline clean out casting 318 wastewater laterals with and without cleanout 319 wastewater lateral wye connection to the existing mainline 320 wastewater lateral cleanout frame and cover 321. Window sill detail anchored brick veneer, cmu backing 01. Grease trap pit is a precipitation system designed to trap grease and suspended sediment in industrial wastewater. Wall access covers do not have frames and are installed in a faceofwall type application. Cleanout plug flush with wall so a mirror or access cover can be.
Plumbing cleanout cad block and typical drawing for. In general, grease traps contain baffles with baffles. Dated january 1, 2012 sw 02, noise wall placement options. The cleanout shall be either inside or outside the building wall and shall be brought up to the finished ground level or to the basement floor level. To properly determine the length of nipple required, deduct 1 from the dimension. The z1441 wall cleanout, with duracoated cast iron body, gas and watertight abs tapered thread plug, round and. Va standard details div 22 plumbing all details wbdg. Public works department city of bothell revision date feb, 2012 approved by. Meter runs shall be constructed in accordance with shsu details. Masonry detailing series international masonry institute. An approved twoway cleanout is allowed to be used at this location to serve as a required cleanout for both the building drain and building sewer. Traffic management plans and detail drawings pdf 4. Selection of a zurn floor cleanout should be based on the load factor and the anticipated traffic.
Technical drawings nyloplast engineered drainage structures. Face plate c finished wall abs nipple abs coupling 2 12 note. The city of atlanta requires certain rules and guidelines for all work in the public rightofway. Stormwater management terminator system double catch basin xt8 section detail xt8 section detail dimensions xt slot drain xt4 xt900 catch basin infill turf porous track surface pro channel to xt slot drain detail xt4 slot drain specification drawing suspended installation xt4.
1321 1227 1132 1489 525 844 963 231 374 1487 553 1021 472 134 805 1120 1012 1333 1296 1416 874 1419 1156 1021 910 1430 487 1484 1479 681 397 138 1463 1328 989 309 1171